How No Upfront Solar Works

No upfront solar follows 4 stages from eligibility check to activation in 3–6 weeks. Free survey, MCS-certified installation, and 24/7 monitoring included. Full process explained.

Start Your Journey

A no upfront solar subscription takes 4 stages and 3 to 6 weeks from initial enquiry to generating electricity at your property. The process begins with a 2-minute online eligibility check, progresses through a free in-home property survey and bespoke system design, and concludes with a 1–2 day MCS-certified installation followed by immediate activation. Every stage is managed by qualified professionals at no cost to the homeowner — there are no fees, deposits, or charges at any point before the first monthly subscription payment begins.

No upfront solar works differently from a cash purchase because the subscription model removes every financial barrier to installation. A cash buyer must research systems, compare quotes from multiple installers, arrange financing, and coordinate the installation independently. With a no upfront solar subscription, the provider handles the entire process — from assessing your roof via satellite imagery to registering the completed installation with your local Distribution Network Operator (DNO).

The 4 Stages

From eligibility check to system activation

Stage 1
2 minutes

Eligibility Check and Initial Quote

Checking your eligibility for a no upfront solar subscription takes approximately 2 minutes and requires 4 pieces of information: your postcode, property type, approximate monthly electricity spend, and whether you own the property.

  • No credit check performed at this stage
  • Submitting the form does not affect your credit score
  • Desktop assessment using satellite imagery of your roof
  • Indicative quote received within 48 hours
Stage 2
1-2 hours

Property Survey

A qualified surveyor visits your home to conduct a detailed assessment of 6 factors that determine the final system design.

  • Roof structure assessment
  • Electrical infrastructure review
  • Shading analysis using specialist tools
  • Available mounting area measurement
  • Access requirements evaluation
  • Planning considerations check
Stage 3
5-10 days

System Design and Confirmation

The provider designs a bespoke solar panel and battery system matched to your property's characteristics and your household's electricity consumption.

  • Panel layout optimized for maximum generation
  • Battery capacity sized to match evening consumption
  • Inverter specification matched to panel array
  • Wiring route planned for internal routing
  • Month-by-month generation estimates provided
Stage 4
1-2 days

Installation

MCS-certified engineers install the complete solar panel, battery, and inverter system in 1 to 2 days for standard residential properties.

  • Scaffolding erection (1-2 hours)
  • Roof mounting and panel installation
  • Battery and inverter fitting
  • Electrical connection and testing
  • DNO registration (1-5 working days)
  • System activation and monitoring

Why Choose No Upfront Solar?

The subscription model removes every financial barrier to installation

No Upfront Cost

Zero deposit, zero installation fee. You start paying only when the system is generating electricity.

Professional Management

From satellite assessment to DNO registration, the provider handles everything. Your role is simple.

Fixed Monthly Payment

Predictable costs that include installation, maintenance, monitoring, insurance, and component replacement.

Immediate Savings

Reduce your electricity bills by 70–90% from the first full month of operation.

Export Income

Earn £100–£500 per year from surplus electricity via the Smart Export Guarantee.

25-Year Warranty

Full system warranty, maintenance cover, and component replacement included for 25 years.

Ready to Get Started?

Complete the 2-minute eligibility check to see your indicative quote and begin your journey to lower energy bills.

Get Your Free Quote